
Post-construction stormwater compliance for Texas commercial properties.
An annual program that keeps your basins, vaults, and conveyance systems documented, inspected, and in regulatory good standing.
Most stormwater violations happen years after the ribbon is cut.
Most stormwater violations don't start during construction. They start two, five, ten years later, when no one in the building remembers who is responsible for the basin behind Building C, and a city inspector knocks anyway.
Ongoing program management for stormwater BMPs after substantial completion. We run the inspection calendar, file the city and TCEQ paperwork, and coordinate repairs before the next inspection cycle exposes them. Billed as a flat annual fee, not by the hour.
Post-construction stormwater is the long-tail compliance work that begins at substantial completion and continues for the operational life of the property. Every detention basin, retention pond, water-quality vault, filter strip, and conveyance line on your site carries an Operations and Maintenance obligation written into the original development approval. Those obligations don't expire when the contractor leaves and a property changes hands. They sit on the asset, quietly accruing inspection cycles, sediment, and vegetation work. Most San Antonio properties we audit are out of compliance on at least one of them before we walk the first basin.
We take over the program. The annual TCEQ and City of San Antonio reporting, the inspection schedule for every BMP on the site, mowing and vegetation management on basin side-slopes, sediment removal timing, trash-rack clearing, and repair coordination when something breaks between visits. Ownership receives one quarterly report: a plain-language summary of what was inspected, what was repaired, what's coming next quarter, and the line items the budget is tracking against. Property managers get a calendar they can actually plan around. Asset managers get a compliance file that reads cleanly during due diligence, lender questionnaires, and the eventual sale or refinance of the property.
The work itself is unglamorous and structural to long-term asset health. A detention basin that has lost 20% of its design volume costs nothing to anyone, on paper, until the storm event that overtops the embankment costs roughly the price of every car in the surface lot below it. A vault that has been bypassing untreated runoff for two years costs nothing, until the City pulls service records during an MS4 audit. Post-construction compliance is the boring, scheduled work that keeps both of those bills from ever being written.
Twelve months of post-construction stormwater work, scheduled.
- Step 01
Audit
Inventory every BMP on the property; pull the original O&M obligations and flag what's missing or overdue.
- Step 02
Plan
Build a 12-month calendar with inspection dates, maintenance windows, and a flat annual budget. One number, no hourly billing.
- Step 03
Execute
Quarterly site visits: inspections, vegetation and sediment work, repair coordination, city filings as they come due.
- Step 04
Report
Quarterly summary to ownership; annual compliance package for the City of San Antonio and TCEQ.
Inside a post-construction stormwater program.
- Annual inspection calendar for every BMP on site
- Site-specific O&M manual and turnover documentation
- City of San Antonio and TCEQ reporting filed on schedule
- Vegetation, sediment, and trash management on a quarterly cycle
- Quarterly written report to ownership: what was done, what's next, budget tracking

Post-construction stormwater questions from Texas owners.
Related stormwater services.

Stormwater Pollution Prevention Plan
Site-specific Stormwater Pollution Prevention Plans for Bexar County construction, written to the TCEQ Construction General Permit (TXR150000) and built so your superintendent will actually open the binder.
Learn more
40-Point Stormwater Inspection
One inspector, one tablet, 40 checkpoints. You get the report before our truck leaves the property.
Learn more
Stormwater Filter Service
Confined-space crews, OEM-spec cartridges in the truck, waste manifested off site. Your treatment vault back to design flow in a single visit.
Learn more
Get a stormwater
compliance quote.
Free site walk, written scope of work, fixed-price quote. Usually back to you within 48 hours.