
Texas SWPPP services. Plans written and permits filed statewide, inspections on the I-35 corridor.
We write the plan and file the permit for construction anywhere in Texas. We put an inspector on the site across the San Antonio metro and up the I-35 corridor. Those are two different answers and you should have both before you call.
The scope, and where each piece of it travels.
SWPPP preparation, anywhere in Texas
Site-specific plan written to TXR150000 from your grading plan, phasing plan, soils report, and aerial. Two to three weeks. No template with another firm's logo taken off.
NOI, NOC, and NOT filing with TCEQ
Notice of Intent filed through STEERS with permit coverage confirmed in writing before you break ground, a Notice of Change as the site changes, and the Notice of Termination once final stabilization is signed off.
Plan review on a SWPPP somebody else wrote
Flat-fee read against TXR150000 and the local checklist, findings in writing. Usually ordered after a Notice of Violation, occasionally before a purchase closes.
Edwards Aquifer WPAP
Recharge and contributing zone sites sit under 30 TAC Chapter 213 and need a Water Pollution Abatement Plan that TCEQ genuinely reviews and approves. That review drives the whole project calendar, so raise it early.
SWPPP inspections, San Antonio metro and I-35
Weekly and post-rain inspections signed to TXR150000 across Bexar, Comal, Guadalupe, Hays, and Travis counties. Past those counties the drive stops paying for itself.
The Texas Construction General Permit is a statewide instrument. TXR150000 is the same permit in El Paso as it is in Beaumont: the same one-acre threshold, the same Notice of Intent through STEERS, the same requirement that the plan be site-specific and on site before ground breaks. That is why plan writing travels and inspection does not. We can build a SWPPP for a job in Lubbock from the grading plan, the phasing plan, the soils report, and the aerial, and file the NOI the same week, without anybody driving nine hours to hand over a binder.
What does not travel is the local layer. A SWPPP that satisfies TCEQ can still get kicked back by the city reviewing it, because the erosion-control detail sheet, the inspection form, and sometimes the approved BMP list belong to the AHJ rather than the state. We write to the reviewer who will actually open it. In San Antonio that is the City and SAWS. In unincorporated Bexar County it is the county's own checklist. Over the Edwards Aquifer recharge zone it is a separate TCEQ program with its own approval and its own schedule. On a job outside our corridor we pull the local requirements before drafting, and an AHJ that runs something we have not written to before gets raised in week one, not discovered at submittal.
Inspections are the honest limit. The permit wants a qualified person physically walking the site every seven days and again after any half-inch rain, and there is no remote version of that. Our inspectors run Bexar, Comal, Guadalupe, Hays, and Travis counties: San Antonio, Boerne, New Braunfels, Seguin, San Marcos, and Austin. If your site is in Fort Worth, we will write the plan and file the permit, and then tell you to hire somebody local to walk it, because a weekly inspection from four hours away is a line item rather than a service.
Plans, filings, and plan review: anywhere in Texas. Inspections and field work: San Antonio, Austin, and the I-35 corridor between them. If your site sits outside that, ask anyway and you will get a straight answer instead of a quote.
The services behind this work.
Stormwater Pollution Prevention Plan (SWPPP)
A San Antonio SWPPP company that writes the plan, files the NOI, and walks the binder with your superintendent. Site-specific to your grading plan, written to TXR150000, not a template with somebody else's logo taken off.
Read moreStormwater Inspection Services
CISEC and CESSWI inspectors, on your site every seven days while the job is live and on your MS4's schedule once it is not. One inspector, one tablet, forty checkpoints, and the report before the truck leaves the property.
Read morePost-Construction Stormwater
An annual program that keeps your basins, vaults, and conveyance systems documented, inspected, and in regulatory good standing.
Read moreWhat Texas contractors ask before hiring us out of market.
Get a stormwater
compliance quote.
Free site walk, written scope of work, fixed-price quote. Usually back to you within 48 hours.